Areva launches 8MW turbine

FRANCE: Areva has launched an 8MW turbine with plans for the prototype to be installed in 2015 and serial production to begin in 2018.

Areva's 8MW (Picture credit: Areva)

You should be redirected in a few seconds, if you are not click below: