Search “uåX˜äŠÊ˜·³Ç

To refine your search, click on any of the filters in the box on the right

Search results for 'Fukushima'

170 results

Japan brings 300MW of new wind online in first weeks of 2024

, Fukushima. Elsewhere Japan’s Ministry of the Environment requested that the impact ...

GE Vernova to supply turbines for onshore wind farm in Japan

planned in Fukushima prefecture in the east of Japan's main island of Honshu. It signed a ...

On My Radar with Eize de Vries: Copper shortage should prompt capacity factor rethink

, from today’s perspective, rather optimistic considering the Fukushima nuclear disas...

Toyota Tsusho to take control of renewables firm set up to green post-Fukushima Japan

developer set up by Japanese billionaire Masayoshi Son after the Fukushima nuclear disaste...

Japanese power giants eye floating offshore wind pilot near site of Fukushima nuclear meltdown

Japanese gas giant Tokyo Gas plans to build an offshore wind farm off the Fukushima prefect...The offshore location being studied alongside Shinobuyama Fukushima Electric Power is on Ja...

Japan to decommission floating offshore wind test turbines

The Japanese government has decided to remove floating offshore wind pilot turbines off Fukushim...Two pioneering floating offshore wind turbines at a test site off the coast of Fukushima, J...

Insight report: The 40 most promising wind turbine designs that fell short of expectations – 1-5

became operational in 2015 as a floater off the Japanese coast near Fukushima, but, accord...

High-risk offshore wind contractors drive up premiums

near Fukushima, Japan, keeled over in 2016 (pic: Yomiuri Shimbun) As the offshore wind ...

Japanese firm unveils next-gen installation vessel plans

details for auctions. Shimizu has previously worked on Japan’s 7MW Fukushima floa...

Ørsted signs Japanese offshore wind MoU

January 2019. Tepco, which operated the Fukushima Daiichi nuclear power plant deva...

Ten of the biggest offshore turbines

decommissioned; the other on a floating platform at Fukushima in Japan. But there seems...

Mitsui acquires 50% stake in Yushan Energy

". Through its Engineering and Shipbuilding (MES) business unit, Mitsui is involved in the Fu...

Vestas joins the 4MW class

has failed to really materialise following the Fukushima nuclear disaster, with only 196MW...

LM completes Hitachi 5.2MW blade tests

platform as part of the Fukushima Forward project further north along Japan's eastern coas...

Principle Power and Mitsui form partnership

-submersible floating offshore foundation, Fukushima Mirai, as part of the 7MW Fukushim...

Japanese offshore wind 'not utilised and underestimated'

the Fukushima nuclear incident in 2014, Japan has reduced its reliance on nuclear to pract...

Review of 2016 - part one

at Osaka Bay in Japan. It was on its way to the project site near Fukushima when the pl...

Weathering the storms

that devastated eastern Japan in 2011, destroying the Fukushima nuclear power plant locate...

Hitachi 5MW set for Spanish test site

", is currently being installed at the Fukushima floating turbine pilot project i...

Hitachi adds to 5MW platform

with the 126-metre rotor is currently installed on a floating platform as part of the Fukushima...