The V60 is designed for high altitude conditions with low-to-medium wind speed conditions. The turbine has an internal heating system and a wind sensor with a built-in heater to handle problems caused by ice and snow.
Speaking about the contract, Vestas China president Jens Tommerup said: "We firmly believe that wind turbines that are best suited for the wind and terrain conditions in question are paramount to achieving a higher level of productivity, and this is a significant parameter for the return on investment over the 20-year lifetime of the project."