FOUR MICON 600 KW INSTALLED IN ALTENBURG
Four Micon 600 kW turbines are to be installed near Altenburg, also in the state of Thüringia. Once operating this will bring capacity in Thüringia to 7.4 MW. Micon's agent in Germany, Dieter Fries, says Micon is now the leading wind turbine supplier to the state.