You should be redirected in a few seconds, if you are not click below:
ETI modular blade project timeframe slips
UK: The development of an 80-metre prototype for Energy Technologies Institute (ETI), Blade Dynamics' "very long blade project" has slipped behind schedule with testing due to take place in the summer 2015.
