Overall, the deal is for 18 MM92 2MW turbines for RidgeWind's Wandylaw project, Northumbria, and eight turbines for AES's Yelvertoft wind farm in Northamptonshire.
The company has also won three Scottish contracts worth a total of 30MW. Repower will deliver five MM82 turbines to Whirlwind Renewables' Wathegar wind farm in Caithness, and four and six MM82s to International Power's Barlockhart Moor and Blantyre Moor projects in southern Scotland respectively.
Including the Ormonde offshore wind farm, the deal will take Repower's total installations in the UK to over 1GW.
Andreas Nauen, CEO of REpower Systems SE, commented: "Reaching 1GW of signed contracts is a huge achievement for us. REpower UK is enjoying a period of steady growth having signed contracts totalling 190MW since the end of last year. I believe this demonstrates the growing reputation of Repower turbines in the British market, and is a solid indication that the wind sector remains in good health."
Repower adds 66MW in UK deals
UK: Repower has been handed deals for projects totalling 66MW in England and Scotland.
