However, Nayagam added any European turbine designs would need to be tailored to Indian offshore conditions where wind speeds rarely exceed 6-7 metres per second.
Nayagam also said CWET is working with Scottish Development International to build a 100-metre mast to measure wind levels. Scottish Development signed a co-development deal with the Indian government in 2009.