Electricity from the 400MW Gode Wind II and other wind farms will be transmitted to an onshore HVDC station at Dorpen, just inland from the north German coast near the Dutch border.
ABB’s Head of Power Systems Peter Leupp said the deal had come about because of the company’s "in-house manufacturing capability of converter stations, cables and semiconductors – the essential components of HVDC systems".
The offshore network, in the southern North Sea, is scheduled to be operational in 2015. It will be the third offshore-wind connection order for ABB in Germany, following the 800MW Dolwin 1 link awarded last year and the previous BorWin 1 project.